Our landscapers have been working diligently during the winter storm, applying salt and shoveling snow to ensure a safe environment. Please exercise caution when walking on the grounds.
Our landscapers have been working diligently during the winter storm, applying salt and shoveling snow to ensure a safe environment. Please exercise caution when walking on the grounds.
Annual Pressure Washing, We will move this activity to semi-annual maintenance schedule within our reserve study. Photos of 2022 seen here:
100% of windows & doors have been replaced. More details in meeting minutes.
All intake plumbing pipes have been completely replaced starting at the point where the city water meeter ends and the responsibility of the association begins. This would be considered a life long building elements and at this time not in the reserve study-- A likely life span of 50-75 years and more details are in meeting minutes.
Upper unit toilet arms were replaced while each lower level toilet flange was inspected and documented as a direct cast iron connection. This should alleviate any leakages and ensure proper functionality. All wax rings were replaced. More information found in meeting minutes.
Bathroom vents activated with motion sensors were installed to assist with airflow to assist in prevention of mold growth inside condo units-- with a new sealed building exterior air can become trapped inside more easily. Further details are in meeting minutes.
The building's framing intersecting with the concrete foundation was rooted in several areas specifically around units 4, 5, 6, 12, & 14. This was causing the building to being sinking in effected areas. This has been remediated and sample photos are seen here- more information is available in meeting minutes.
The building common area has an upgraded modern electrical panel. More details can be found in meeting minutes.
The building's roof has been completely replaced including damaged sections of the main beam roof truss. Please see meeting minutes for more details.