Building Rehabilitation (Toilet Arms)

Upper unit toilet arms were replaced while each lower level toilet flange was inspected and documented as a direct cast iron connection. This should alleviate any leakages and ensure proper functionality. All wax rings were replaced. More information found in meeting minutes.