Introducing Annual Pressure Washing!

Monday July the 22nd possibly into Tuesday the 23rd will see the entire building area washed

🚧🚧 We will need the first few feet of your parking spaces 🚧🚧

Starting in mid 2019 the community will introduce annual pressure washing in order to keep moss growth at bay! This will include a combination of high pressured & low-pressure spray in addition to multiple-month powder treatment of moss on softer surfaces such as our perimeter brick. We're also excited to announce this project is possible because of the Board of Director's renewal of best practices when regarding community funds> point-in-case, in 2019 & beyond Pressure washing will be funded by reallocating unnecessary spending.

This includes all common area sidewalks, all stairwells, both carports, and soft wash perimeter brickwork!

Screen Shot 2019-03-19 at 2.17.51 AM

CarPort LED Lighting Phase 2/3

A quick update on LED lighting for our carport!

Phase 2/3 saw the fourth fixture installed in carport #1 additionally all four fixtures in carport#2 at 4000K Kelvin rating.

We also saw a brighter light insatalled above the basment door nearest to Catlin Ave.

Phase 3/3 should see the completetion of the lighting up the alleyway with 3000K kelvin rating within the next few weeks.

Screen Shot 2019-05-30 at 10.16.48 PM
Screen Shot 2019-05-30 at 10.26.51 PM
Screen Shot 2019-05-30 at 10.27.15 PM

Irrigation Fixed!

We have been able to cut the water bill down by an average of ~$200 per month in addition to our continued efforts to pull water away from the foundation of the building!

This has been achived by replacing a busted irrigation timer.

Broken irrigation timer was flooding the grounds on a regular basis; this has been resolved.

Screen Shot 2019-05-31 at 11.48.51 AM
Screen Shot 2019-05-31 at 11.50.07 AM

Old Vs. New

Screen Shot 2019-05-31 at 11.48.19 AM
Screen Shot 2019-05-31 at 11.48.31 AM

Carport LED Lighting Phase 1/3

LED Lighting Phase 1/3

 

A key area of improvement is to deliver LED lighting. The community has installed half of it's additional LED light strips in addition to floodlights for the surrounding area.

Please take a look at the before & after photos below!

Screen Shot 2019-03-20 at 12.04.28 AM
Screen Shot 2019-04-18 at 10.06.30 PM

As you can see below, we litterary have a 'night & day' differnce in terms of before & after

(Left vs Right side of the trash area).

The community will be addressing dark spots as seen in this photo. Stay tuned!

 

Finalization of Basment Doors

Hey everyone!

All basment doors have been structurally finalized recalibration,

bolted plywood reinforcement, weather-stripped, and set to be primered in Auguest.

 

North Side Basment

 

 

 

 

 

South Side Basment

 

 

 

Trash Enclourse​ Finalized

After some delay, we finally have a secure trash area & LED lighting is currently in the works. This is an area where the community has come a long way and should be one of the many positive steps in 2019 in our community.

Thanks to Superior Fence for this job.

Screen Shot 2019-04-07 at 11.11.46 AM
Screen Shot 2019-04-07 at 11.11.59 AM
Screen Shot 2019-04-07 at 11.11.29 AM

Basment Doors

All basement door hinges have been calibrated, all door handles updated, all frames weatherized, LED lighting updated, and shrubbery removed. We hope to take additional steps in order to secure the basement areas.

image-06Feb2019
image-06Feb2019-1

Photos are from the test pilot phase; please stay tune for updates.Â